As buildings become taller, keeping them stable becomes an increasing challenge. Usually, engineers use strong cores made of steel or […]
While looking over drawings of building plans, I noticed how some walls were marginally thicker than other walls in the […]
I have always wondered what criterion drives architects to choose reinforced concrete vs steel for a building’s structure. Some buildings […]
Growing up in the bay area, I was always one drive away from large buildings in that dominated the San […]
With the vast amount of infrastructure around the world, several collapses have happened and likely will continue to happen. Rather […]
I recently recorded some data from my personal weather station that was very odd for this time of year. During […]
After structural designs are ready, a building must be built up to its standards. At first, I assumed all that […]